One Stop

Level 2 specification

NR/L2/TEL/30160

Specification for Loose-Tube Optical Fibre Network Design

Issue 5, 05 September 2026 · Fibre design

What the standard is for: the principles behind adding to or changing NR's existing loose-tube fibre network so capacity is protected. Issue 5 note: High Count Fibre Cable (HCFC) is now the default for new trunk cable under NR/L1/TEL/30102 — new trunk fibre is designed to NR/L2/TEL/31200; 30160 is for upkeep of, and designs interfacing with, existing loose-tube assets

Clause map — what each clause deals with

1PurposeWhat the standard is for: the principles behind adding to or changing NR's existing loose-tube fibre network so capacity is protected. Issue 5 note: High Count Fibre Cable (HCFC) is now the default for new trunk cable under NR/L1/TEL/30102 — new trunk fibre is designed to NR/L2/TEL/31200; 30160 is for upkeep of, and designs interfacing with, existing loose-tube assets
2ScopeWhat it covers: cabling parameters, permissible loss and configuration of the loose-tube fibre network
3AbbreviationsAbbreviations used in the standard (ADM, BTS, CWDM/DWDM, OTDR, ZHLS and so on)
4DefinitionsDefinitions: access node, core node, spur, spliceless joint and the other terms the standard relies on
5.1General principlesHow NR's fibre is organised overall: FTN, FTNx and the separate signalling/electrical networks that interface with them
5.2FTN core nodesWhat an FTN core node is and its role in the transmission rings
5.3FTN/FTNx access nodesWhat FTN/FTNx access nodes do and how they are classed
5.4FTNx core nodesFTNx core nodes and the DWDM equipment they house
5.5FTNx in-line amplifier sitesFTNx in-line amplifier sites and where they are usually accommodated
5.6FTNx sub access sitesFTNx sub-access sites — the small lineside locations that hang off the access layer
6.1General mattersWhy a cable route survey comes first and what the survey has to establish
6.1.1Centre to centre cable lengthsHow centre-to-centre cable lengths are measured, the length allowances to add (joints, terminations, slack), and where spur cables may terminate
6.2Joint locationsHow joint locations are chosen — spacing, drum handling, access, theft and vandalism considerations
6.3Sheath gapsWhy and where the metallic sheath is gapped; points to NR/L3/TEL/30162 for the detail
6.4FTN core node sitesSiting of FTN core nodes and the diverse cabling they need
6.5Access node sitesWhere access nodes are housed and how a single spur cable connects them to the main cable — spur fibre count and routing
6.6FTNx core node sitesSiting of FTNx core nodes relative to FTN core nodes
6.7FTNx in-line amplifier sitesSiting of in-line amplifier sites and the span lengths they support
6.8.1GeneralThe family of cable types that may be used (armoured, duct, ZHLS, DI-SAC, blown fibre)
6.8.2PE sheathed steel tape armoured cablesPE-sheathed steel-tape armoured cable — the default lineside cable; how far it may run into a building, REB or equipment room before you must change to ZHLS (low smoke), and how to make the transition
6.8.3PE sheathed non-armoured (duct) cablesNon-armoured duct cable — what it is for and where it is allowed
6.8.4ZHLS sheathed steel tape armoured cablesZHLS (low smoke zero halogen) cable — where it is mandatory: subsurface stations, long tunnels, and internal runs inside a building or REB beyond the entry allowance to the ODF
6.8.5DI-SACDI-SAC heavily armoured cable for lines with no cable route
6.8.6Blown fibreBlown fibre — what it is and when it suits
6.9Choice of cable typeThe table that maps environment to cable type
7.1GeneralWhy cabling arrangements differ between core and access nodes (resilience)
7.2Optical joint closuresWhat an optical joint closure has to provide — sealing, re-entry, protection
7.3Optical terminationsWhat an optical termination (ODF, pigtails, patching) has to provide
7.4FTN/FTNx Core nodesCabling at FTN/FTNx core nodes — diverse entries, how rings are brought in
7.5FTN/FTNx access nodesCabling at FTN/FTNx access nodes, what to do when fibres are short, and the point-to-point WDM option
7.6Spliceless jointsSpliceless joints — when they are used instead of a full splice and how the cable loop passes through
7.7.1GeneralAdding a new access node (REB, cabinet, ATEH) to an existing cable — why spur cables are kept short, and the maximum spur length from a joint for the first spur and for a second resilience spur
7.7.2Access nodesFigure 3 — the three drawn scenarios (A, B, C) for connecting a new access node by spur depending on how far it sits from the nearest joint, and when a new joint pair is cut in instead
7.7.3Core nodesInserting a new core node into an existing cable
8.1GeneralGeneral splicing requirements and the limit on how many splices a fibre may carry
8.2Through jointsThrough (straight) joints — fibre-to-fibre splicing by colour and tube, including DI-SAC to standard cable; Issue 5 makes the tube-handling rule mandatory (only tubes with fibres in use are stripped, uncut tubes coiled and stored in the closure)
8.3Spur jointsSpur joints — connecting additional sites into a main cable (not limited to FTN access nodes since Issue 4), and the rule that a spur joint is never a distribution point or a spur-to-spur connection
8.4Terminations at core nodesHow fibres are terminated at core nodes (pigtails or DWDM connectors)
8.5Terminations at access nodesWhich fibres are pigtailed at an access node; points to 30161 for pigtails
8.6Termination at ILA sitesTerminations at in-line amplifier sites and hard-splicing across a core node for DWDM
9Allocation of fibresWhich fibres are allocated to what in a 24-fibre cable — the schedule that says which fibres get spliced or terminated at access and core nodes
10.1GeneralResilience — identifying and removing common-mode failures: separate building entries for diverse cables, one cable buried 600 mm in duct where separation is tight, cables at least 5 m apart
11.1GeneralWhat the loss budget is and why it matters
11.2Optical cable attenuationCable attenuation figures used in loss calculations
11.3Splice lossSplice loss — how it is measured and budgeted; points to NR/L3/TEL/30162
11.4Connector lossConnector loss — what it includes
11.5Calculation of expected section lossHow to calculate expected loss over a core-to-core section
11.6Calculation of expected sub-section lossHow to calculate expected loss over a core-to-access or access-to-access sub-section
Appendix AFibre splicing drawingsFibre splicing drawings — spurs into access nodes, with and without resilience, cable-type transitions
Appendix BNode cabling drawingsNode cabling drawings — cable entries into housings, REBs and buildings

Standards this one points to